Design–build renovation, since 2009

We renovate the house you already love back into shape

Kitchens, baths, additions and whole-home renovations, built by one crew from first sketch to final walkthrough. No subcontractor relay race, no surprise change orders.

Scroll
LICENSED — General contractor #CCB-48213 BONDED & INSURED — $2M liability coverage EPA LEAD-SAFE — Certified renovator on every crew BBB — A+ rating, 14 years running LICENSED — General contractor #CCB-48213 BONDED & INSURED — $2M liability coverage EPA LEAD-SAFE — Certified renovator on every crew BBB — A+ rating, 14 years running
Formwork crew at work on site
340+ Homes renovated
Since 2009

One crew, start to finish

Most renovations fail at the handoffs — the designer who never talks to the framer, the electrician scheduled before the plumber is done. Formwork keeps the same lead carpenter and project manager on your house from demo to punch list, so the person who made the promise is the person who keeps it.

We are a fourteen-person shop, not a franchise. Every project lead has built at least thirty homes in this city and can tell you why your 1920s balloon-framed wall is not like your neighbour's.

Licensed & bonded

General contractor since 2009, zero lapses.

Fixed-price contracts

The number in the contract is the number on the invoice.

In-house design

Architect and carpenter review drawings together before a wall opens.

Before and after

Both photos, full size, at the same time

A slider hides half the evidence behind a handle you have to work for. We would rather you saw the whole before and the whole after in one glance and judged for yourself.

How it runs

Five stages, one calendar

01

Consultation

We walk the house, listen to what is not working, and give you an honest range before you have spent a dollar on drawings.

Week 1
02

Design & estimate

Fixed drawings, a real material list, and a price that does not move once you sign.

Weeks 2–5
03

Permitting

We pull the permits and schedule inspections — you never call the city.

Weeks 4–7
04

Construction

One lead carpenter, one schedule, weekly photo updates whether or not you ask for them.

Weeks 6–20
05

Walkthrough

A written punch list, a same-week fix, and a one-year workmanship warranty.

Final week
340+

Homes renovated

14yrs

In business

4.9/5

Average client rating

96%

Projects finished on the promised date

In their words

What it is like to live through it

“They found the mudroom wall could come out during demo and told us before it changed the price, not after. The kitchen ended up eighty square feet bigger than the contract, for the number in the contract.”

Marisol Feeney Alberta Arts, Portland

“The leak that three plumbers could not find, their crew found in the first hour of demo. I wish I had called them a year earlier.”

Owen Radovic Sellwood, Portland

“Nineteen weeks and the same project manager answered the phone in week one and week nineteen. That alone is worth more than I expected it to be.”

Priya Nandakumar Woodstock, Portland

“The ADU took longer than the brochure version of an ADU always sounds like it should. It also has its own foundation and its own panel, which is apparently the point.”

Dale Ostrander Gresham

“They told us the basement bathroom needed an ejector pump before we signed anything. That single sentence saved us from a very unpleasant mid-project surprise.”

Colette Ashworth Richmond, Portland

Tell us what is not working

Twenty minutes on the phone is usually enough to know whether we are the right crew for your house. No pressure, no glossy sales deck.