Journal / 11 June 2024

Why we still pull permits for a bathroom remodel

A permit is not paperwork for its own sake — it is a second, independent set of eyes on the plumbing and electrical work in a room where both can hurt someone if they fail.

Permits get treated as a tax on doing the work, and sometimes contractors sell skipping them as a favour — faster, cheaper, no inspector slowing things down. We pull them anyway, on every bathroom, every kitchen, every addition.

A city inspector is a second set of eyes with no financial stake in the project finishing on schedule. They have caught things on our jobs before — a GFCI circuit wired wrong, a vent pipe sized too small — that we would rather have caught by an inspector than by a homeowner six months later.

The other reason: an unpermitted bathroom or kitchen remodel is a disclosure problem when the house sells. Buyers’ inspectors ask, and ‘we did it without a permit to save time’ is not an answer that helps anyone at a closing table.

Tell us what is not working

Twenty minutes on the phone is usually enough to know whether we are the right crew for your house. No pressure, no glossy sales deck.